Hotels

Canyons Grand Summit Hotel
 

fd8b0f77d767f1f6640afba6916ff67c_S.jpg
 

Building Highlights: Hotel and Convention Center - 480,000 ft.² / Four (4) to Eight(8) Stories / Two Hundred Sixty-Three (263) Keyed Condo Units / Convention Center, Restaurant, Fitness Center and Spa / Mechanical Systems: Two (2) Chillers - 800 Tons Cooling, Two (2) Cooling Towers - 247,000 CFM, Two (2) Boilers - 38,000 Total MBH, Eight (8) Custom Air Handling Units, 345,000 lbs. of Galvanized Ductwork, Five Hundred Twenty-Eight (528) Vertical Fan Coil Units, Fifty-Five (55) Horizontal Fan Coil Units, Seventeen (17) Exhaust Fans, and Fourteen (14) Unit Heaters, Forty-Five (45) Pumps, Thirteen (13) Expansion Tanks, Twenty-Six Thousand Three Hundred (26,300) Square Feet of Snowmelt, One Thousand Seven Hundred Thirty (1,730) Plumbing Fixtures, Forty-Five (45) Floor Sinks, and One (1) Duplex Water Softener - 1,200,000 Grains
 


Additional Info

  • Location: Park City, Utah
  • Project Owner / Client: American Skiing Company
  • General Contractor: Okland Construction Co., Inc.
  • Architect: JSA Inc. & Brannen Assoc.
  • Mechanical Engineer: Van Boreum & Frank
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Snowmelt, and Plumbing

 

Loews Coronado Bay Resort
 

48ee1e8a0a8f50dce4f8cb9ab418e211_S.jpg
 

Building Highlights: Main Guest Services Building, 5 Main Guest Room Outbuildings, 3 Floors Each, 448 Typical Guest Rooms and Suites, 90 Poolside Double Rooms, 18 Bayside Suites, Central Chiller and Boiler Plant, 15,000 Square Feet of Ballroom Space, 20,000 Square Feet of Function and Meeting Rooms. Total cost approximately $5,968,000
 


Additional Info

  • Location: Coronado, California
  • Project Owner / Client: Loews Hotel
  • General Contractor: Hansel Phelps Construction Co.
  • Architect: C.W. Kim A.I.A.
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering and Design, Heating, Ventilating, Air Conditioning, Plumbing, Site Utilities, Fire Protection

 

Hotel Monaco
 

3899dfe821816fbcb3db3e3b23f81585_S.jpg

Building Highlights: Fifteen (15) Level Hotel / Existing Remodeled Continental Bank Building / Two Hundred Twenty-Five (225) Guestrooms / Exercise Room / Restaurant / Two (2) Full Service Kitchens / Schedule: (Fast Track) - Start: July 1998 - Completion: July 1999 / Mechanical Systems: One (1) Chiller - 270 Tons Cooling, One (1) Cooling Tower, Three (3) Boilers, Twenty-Seven (27) HVAC Circulation Pumps, Twenty-Two (22) Exhaust Fans, Four (4) Makeup Air Units, Three (3) Air Handling Units, One (1) Heat Recovery Unit, Two Hundred Twenty-Five (225) Fan Coil Units, Fourteen (14) Fan Powered VAV Boxes and Eleven (11) Cooling Only VAV Boxes, Nine Hundred Fifty (950) Plumbing Fixtures, One (1) 1,500 Gallon Grease Interceptor, Two (2) Complete Sump Pump Systems.
 


Additional Info

  • Location: Salt Lake City, Utah
  • Project Owner / Client: Kimpton Group
  • General Contractor: Baugh Construction, Inc.
  • Architect: J.G. Johnson Architects
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilating, Air Conditioning, and Plumbing

 

St. Regis Resort
 

c82cc4e14a1d2c8c8ffff9840d24b558_S.jpg

Building Highlights: 446,000 ft.²  / Eleven-Story Building / 26 Private Residences, 67 Condominium Hotel Suites, 181 Hotel Rooms / 14,000 ft.² Spa with Salon / 3,000 ft.² Fitness Facilities / Luxury Ski Lounge with Ski Valet Service / Two-tiered Infinity Pool / Restaurant/Wine Bar/Ski Lounge / Two-Story Underground Parking / Mechanical Systems: Two (2) 12 Million BTU Boilers, Two (2) 400-Ton Chillers, Three (3) Cooling Towers, Three (3) Air Handlers, and Snowmelt System
 


Additional Info

  • Location: Park City, UT
  • Project Owner / Client: Deer Crest Janna LLC
  • General Contractor: Okland Construction Co., Inc.
  • Architect: IBI Group
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilating, Air Conditioning, and Plumbing

 

Canyonlands (Amangiri) Resort
 

220c08548cac211cc7db219bb52f46cf_S.jpg

Building Highlights: Resort / Three Different Room Types / Spa Building / Pool / Service Building / Villa's / Total Square Footage - 84,777 Sq.Ft. / Start: December 2006 - Completion: December 2009 / Mechanical Systems: Two (2) Chillers - 400 Tons Cooling, Thirteen (13) Boilers, Forty-Three (43) HVAC Circulation Pumps, Three (3) Air Handling Units, Forty-Seven (47) Fan Coil Units, Six (6) Variable Frequency Drives, One Hundred Eighteen (118) Plumbing Fixtures, Twenty-Two (22) Floor Drains, Thirty-Three (33) Primary Roof Drains, and Fourteen (14) Secondary Overflow Roof Drains
 


Additional Info

  • Location: Kane County, UT
  • Project Owner / Client: Canyon Development, LLC
  • General Contractor: Okland Construction Co., Inc.
  • Architect: I-10 Studio
  • Mechanical Engineer: Kunka Engineering, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

Montage Resort
 

d3b3799d6611d677944f5f86a500beb3_S.jpg

Building Highlights: Thirteen-Story (13) Hotel/Mountain Resort / 961,000 Sq.Ft. Total / Building Highlights: 154 deluxe guestrooms, 66 suites and residences (guestrooms average 600 Sq.Ft. and suites range from 1,000 to 3,200 Sq.Ft.); Six (6) Restaurants; Spa MONTAGE - 35,000 Sq.Ft., Indoor Lap Pool, Outdoor Pool, Twenty-Nine (29) treatment rooms, two (2) steam rooms, two (2) saunas, two (2) whirlpools, fitness center; Meeting Space - 55,000 Sq.Ft. indoor/outdoor meeting and event facilities / Start: December 2007 - Completion: March 2011 / Mechanical Systems: Five (5) Boilers, Two (2) Chillers, Six Hundred Forty-Eight (648) Exhaust Fans, Nineteen (19) Air Handlers, Thirteen (13) Fans
 


Additional Info

  • Location: Park City, Utah
  • Project Owner / Client: The Athens Group of Phoenix
  • General Contractor: Layton Construction Co., Inc.
  • Architect: HKS, Inc.
  • Mechanical Engineer: Beaudin Ganze Consulting Engineers
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Design-Build: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing