Data Storage / Call Centers

750x150_DATA STORAGE .jpg

America First Credit Union Data Center

Building Highlights: Seismically Base Isolated Structure for Secure Data Center / Total Building - 37,000 ft.² / Start - September 2003 - Completion - April 2004 / Mechanical Systems: Ten (10) Computer Room Units w/260 of Cooling Capacity, Ten (10) Dry Coolers Serving Computer Room Units, Three (3 Rooftop Units w/Seismic Isolation and 42 Tons of Cooling Capacity, One (1) Heat Recovery Unit, Twelve (12) Electric Unit Heaters w/50 KW Heating, Complete Welded and Seismic Isolated Glycol Piping System, Complete Installation of Fuel Oil System for Emergency Generators with Control and Alarm System, Fifteen (15) Variable and Constant Volume Boxes, Sixteen (16) Exhaust, Transfer, and Supply Fans, Complete Seismic Isolated Domestic Plumbing and Piping including Seismic Swing Joints for all Piping and Plumbing Connections to Outside of Building.


Additional Info

  • Location: Riverdale, UT
  • Project Owner / Client: America First Credit Union
  • General Contractor: Okland Construction Co., Inc.
  • Architect: DMJM
  • Mechanical Engineer: Bruns-Pak
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Plumbing, Piping and Temperature Controls

 

Intel SL1

Building Highlights: Level 1 Tenant Finish - 18,000 ft.² / Start: May 2000 - Completion: August 2000 / Mechanical Systems: Low Pressure Duct Distribution Throughout - Utilizing Existing Capacities, Sixty (60) Anemostat Double Deflection Diffusers, Computer Room Split System, Condensate Drain System.


Additional Info

  • Location: Salt Lake City, Utah
  • Project Owner / Client: Intel Corporation
  • General Contractor: Layton Construction Co., Inc.
  • Architect: Intel Corporation
  • Mechanical Engineer: CCI Mechanical, Inc.
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Engineering, Heating, Ventilating, Air Conditioning, and Plumbing

 

Oracle Data Center

Building Highlights: Total - 235,000 ft.² - One (1) Level Building, Including 30,000 ft.² Data Center / Start: April 2010 - Completion: December 2010 / Mechanical Systems: Four (4) Water Cooled Chillers - 1,000 tons cooling each, Four (4) Cooling Towers, Twenty-six (26) Custom Built Air Handling Units, Two (2) VAV Rooftop Packaged Units, One (1) Constant Volume Rooftop Packaged Unit, Thirty-one (31) Exhaust Fans, Two (2) Gas Fired Boilers, Soft Water System, and Chemical Feed System


Additional Info

  • Location: West Jordan, UT
  • Project Owner / Client: Oracle
  • General Contractor: Holder Construction Company
  • Architect: Gensler
  • Mechanical Engineer: Syska Hennessy Group
  • Mechanical Contractor: CCI Mechanical, Inc. / Hill Mechanical Group
  • CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

 

U of U Data Center

Building Highlights: LEED Gold / Computing and Data Storage Facility - 74,000 ft.² / Consolidated Seven Data Centers into a Single Location / Highly Advanced Heating & Cooling System / Start: July 2011 - Completion: December 2011 / Mechanical Systems: Air Cooled Chiller, Built-up Air Handlers, Constant Volume.


Additional Info

  • Location: Salt Lake City, UT
  • Project Owner / Client: University of Utah
  • General Contractor: Okland Construction Co., Inc.
  • Architect: VCBO
  • Mechanical Engineer: Smith Group
  • Mechanical Contractor: CCI Mechanical, Inc.
  • CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing