Location: Salt Lake City, UT
Project Owner / Client: Kimpton Group
General Contractor: Baugh Construction, Inc.
Architect: J.G. Johnson Architects
Mechanical Engineer: CCI Mechanical, Inc.
Mechanical Contractor: CCI Mechanical, Inc.
CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing
Building Highlights: Building Highlights: - Fifteen (15) Level Hotel - Existing Reemodeled Continental Bank Building - Two Hundred Twenty-Five (225) Guestrooms - Exercise Room - Restaurant - Two (2) Full Service Kitchens Construction Schedule: "Fast Track" - Start: July 1998 - Completion: July 1999 Mechanical Systems: One (1) Chiller - 270 Tons Cooling One (1) Cooling Tower Three (3) Boilers Twenty-Seven (27) HVAC Circulation Pumps Twenty-Two (22) Exhaust Fans Four (4) Makeup Air Units Three (3) Air Handling Units One (1) Heat Recovery Unit Two Hundred Twenty-Five (225)Fan Coil Units Fourteen(14)Fan Powered VAV Boxes and Eleven (11) Cooling Only VAV Boxes Nine-Hundred Fifty (950) Plumbing Fixtures One (1)1,500 Gallon Grease Interceptor Two(2)Complete Sump Pump Systems
Location: Salt Lake City, Utah
Project Owner / Client: KUTV - Channel 2
General Contractor: Interior Construction Specialists, Inc.
Architect: Beecher Walker & Associates
Mechanical Engineer: CCI Mechanical, Inc.
Mechanical Contractor: CCI Mechanical, Inc.
CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Temperature Controls, and Plumbing
Building Highlights: Interior Finish for KUTV - Channel 2 Including Four (4) Studios, Editing, and Audio Rooms. Main Equipment and Office Space - Total Finish - 37,000 ft.². Construction Schedule: Start - March 2003 / Completion - December 2003. Mechanical Systems: Two (2) 40-Ton Air Cooled Chillers, Two (2) 100 GPM Chilled Water Pumps, Twenty-Four (24) Fan Coil Units, Seventeen (17) Plumbing Fixtures, Stand Alone Johnson Controls Metasys Building Management System, and 100-Ton Plate and Frame Heat Exchanger.