Location: Cedar City, UT
Project Owner / Client: The Catholic Diocese
General Contractor: Hebert Construction
Architect: ASWN Architects
Mechanical Engineer: CCI Mechanical, Inc.
Mechanical Contractor: CCI Mechanical,Inc.
CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Piping, and Controls
Building Highlights: Building Highlights: 17,800 ft.² - 7,800 ft.² classrooms and 10,000 ft.² church and gathering space. The Church Area has Hot Water Heating in the Floor. Construction Schedule: - Start: February 2003 - Completion: October 2003 Mechanical Systems: Seven(7) Rooftop Units - Totalling 30 Tons One (1)750,000 BTU Boiler One (1) DX Air Handler w/40 Ton Condensing Unit Two (2) Pumps