Religious / Churches

Christ the King

Location: Cedar City, UT

Project Owner / Client: The Catholic Diocese

General Contractor: Hebert Construction

Architect: ASWN Architects

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical,Inc.

CCI Mechanical Role: Heating, Ventilation, Air Conditioning, Piping, and Controls

Building Highlights: Building Highlights: 17,800 ft.² - 7,800 ft.² classrooms and 10,000 ft.² church and gathering space. The Church Area has Hot Water Heating in the Floor. Construction Schedule: - Start: February 2003 - Completion: October 2003 Mechanical Systems: Seven(7) Rooftop Units - Totalling 30 Tons One (1)750,000 BTU Boiler One (1) DX Air Handler w/40 Ton Condensing Unit Two (2) Pumps