Office Buildings

Daybreak Corporate Center

Location: South Jordan, Utah

Project Owner / Client: Kennecott Land Company

General Contractor: Sahara, Inc.

Architect: FFKR

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - LEED Platinum, - Three Story Building, - 178,000 ft.², - Three Story Parking. Construction Schedule: - Started: July 2006, - Completed: October 2008. Mechanical Systems Include: Two (2) Direct/In-direct Air Handlng Units on Roof, Two (2) Cooling Towers, One (1) 300-Ton Chiller, Three Zone Snowmelt System.

RiverPark - Phase I

Location: South Jordan, UT

Project Owner / Client: RiverPark One, LLC

General Contractor: Layton Construction Co., Inc.

Architect: MHTN

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Plumbing, and Controls

Building Highlights: Building Highlights: - Three Level Office Building Core and Shell, - Total Building - 99,000 ft.². Construction Schedule: - Start: February 2001, - Completion: December 2001. Mechanical Systems: Three (3) Air Handling Units w/Variable Frequency Drives, Twelve (12) VAV Boxes, One (1) 250 Ton Chiller, One (1) 1,435 MBH Boiler, Four (4) Pumps, Sixty-Seven (67) Plumbing Fixtures, Complete Johnson Metasys Building Automation System, Including Lighting Controls.

Jordan Commons Office Tower

Location: Sandy, UT

Project Owner / Client: Larry H. Miller Group

General Contractor: Sahara, Inc.

Architect: FFKR

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - 10-Story Office Tower. Construction Schedule: - Start: July 1998, - Completion: August 1999. Mechanical Systems: Two (2) 250 Ton Chillers, Ten (10) Air Handlers (1 per floor), Two (2) Hot Water Boilers 4,000,000 BTU's each, Seventeen (17) Pumps, Thirty (30) VAV Boxes per Floor, One (1) Cooling Tower on Roof, Six (6) Different Snowmelt Systems, Alerton Controls w/Energy Management System.

Clearwater Center

Location: Bountiful,UT

Project Owner / Client: Sahara, Inc.

General Contractor: Sahara, Inc.

Architect: Gilles Stranskey Brems Smith Architects

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - Three-Story Office Building, - 15,000 ft.², - Exterior Water Fountain. Construction Schedule: - Start: July 1998, - Completion: January 1999. Mechanical Systems: Three (3) Rooftop Units - 40 Tons Each, One (1) Boiler - 1.5 Million BTU\\\'s, Two (2) Building Relief Fans, One (1) Exhaust Fan, HVAC and Lighting Monitoring System, Completely Designed and Constructed Exterior Water Fountain, Pumps and Controls for Exterior Water Fountain, Twelve (12) Electronic Operated Water Closets and Urinals, Twelve (12) Electronic Operated Lavatories, Three (3) Electric Water Coolers, Complete Domestic Water Heating System.

Wells Fargo Center (formerly American Stores Corporate Headquarters)

Location: Salt Lake City, UT

Project Owner / Client: Wasatch Property Management, Inc.

General Contractor: Howa Construction, Inc.

Architect: HKS, Inc.

Mechanical Engineer: Blum Engineering, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - 25-Story Office Building, - 640,000 ft.², Basement - Mechanical Room, Kitchen/Restaurant Prep and Storage, Floor 1 - Grocery Store and Retail / Floor 2 - Restaurant/Bar and Office, Floor 3 - Tech Ops/Training, Floors 4-22 - Typical Offices / Floors 23-24 - Executive Offices, Floor 25 - Penthouse Mechanical Room, Roof - Two (2) Helipads, (Note: Approximately 14,000 ft.² of snowmelt piping covers penthouse and roof.). Parking Structure Highlights: 532,000 ft.² (1,456 parking stalls), Levels B1 and B2 - Underground Parking, Ground Level - Retail, Health Club, and Parking, Levels 2-7 - Typical Parking (Cooling Towers on 6th Level). Construction Schedule: - Start: November 1995, - Completion: January 1998. Mechanical Systems: Three (3) Chillers (1,700 Total Cooling Tons), Forty-One (41) Air Handling Units (40 Cooling Only), Six Hundred Forty (640) Variable Air Volume Boxes (Cooling Only), One Hundred Thirty (130) Fan Powered Boxes (w/Hot Water Coils), Three (3) Boilers (21,000,000 Total BTU's), Sixteen Thousand (16,000) ft. (approximately) of Hot Water Fin Tube, Four Thousand Two Hundred (4,200) Registers, Grilles, and Diffusers, Seven Hundred (700) Plumbing Fixtures.

Broadway Center

Location: Salt Lake City, UT

Project Owner / Client: Broadway Center, Ltd.

General Contractor: Pentalon Construction

Architect: Edwards and Daniels Architects, Inc.

Mechanical Engineer: Colvin Engineering Associates, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Heating, Ventilation, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - 14-Story Office Building, - Four (4) Theaters, - Ground Level Restaurants, - 185,000 ft.². Construction Schedule: - Start: March 1990, - Completion: August 1991. Mechanical Systems: Two (2) Water Cooled Chillers, One (1) Cooling Tower, One (1) Boiler, Hot Water Baseboard Heating Throughout, Emergency Generator Exhaust System, One Hundred Fifty-Six (156) Plumbing Fixtures, One (1) Domestic Hot Water System Recirculation.