Hotels

Canyons Grand Summit Hotel

Location: Park City, Utah

Project Owner / Client: American Skiing Company

General Contractor: Okland Construction Co., Inc.

Architect: JSA Inc. & Brannen Assoc.

Mechanical Engineer: Van Boreum & Frank

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Heating, Ventilating, Air Conditioning, Snowmelt, and Plumbing

Building Highlights: Hotel and Convention Center - 480,000 ft.² Four (4) to Eight(8) Stories Two Hundred Sixty-Three (263) Keyed Condo Units Convention Center, Restaurant, Fitness Center and Spa Mechanical Systems: Two (2) Chillers - 800 Tons Cooling Two (2) Cooling Towers - 247,000 CFM Two (2) Boilers - 38,000 Total MBH Eight (8) Custom Air Handling Units 345,000 lbs. of Galvanized Ductwork Five Hundred Twenty-Eight (528) Vertical Fan Coil Units Fifty-Five (55) Horizontal Fan Coil Units Seventeen (17) Exhaust Fans and Fourteen (14) Unit Heaters Forty-Five (45) Pumps and Thirteen (13) Expansion Tanks Twenty-Six Thousand Three Hundred (26,300) Square Feet of Snowmelt One Thousand Seven Hundred Thirty (1,730) Plumbing Fixtures Forty-Five (45) Floor Sinks One (1) Duplex Water Softener - 1,200,000 Grains

Loews Coronado Bay Resort

Location: Coronado, California

Project Owner / Client: Loews Hotel

General Contractor: Hansel Phelps Construction Co.

Architect: C.W. Kim A.I.A.

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering and Design, Heating, Ventilating, Air Conditioning, Plumbing, Site Utilities, Fire Protection

Building Highlights: Main Guest Services Building, 5 Main Guest Room Outbuildings, 3 Floors Each, 448 Typical Guest Rooms and Suites, 90 Poolside Double Rooms, 18 Bayside Suites, Central Chiller and Boiler Plant, 15,000 Square Feet of Ballroom Space, 20,000 Square Feet of Function and Meeting Rooms. Total cost approximately $5,968,000

Hotel Monaco

Location: Salt Lake City, Utah

Project Owner / Client: Kimpton Group

General Contractor: Baugh Construction, Inc.

Architect: J.G. Johnson Architects

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilating, Air Conditioning, and Plumbing

Building Highlights: Building Highlights: - Fifteen (15) Level Hotel, - Existing Remodeled Continental Bank Building, - Two Hundred Twenty-Five (225) Guestrooms, - Exercise Room, - Restaurant, - Two (2) Full Service Kitchens. Construction Schedule: \\\"Fast Track,\\\" - Start: July 1998, - Completion: July 1999. Mechanical Systems: One (1) Chiller - 270 Tons Cooling, One (1) Cooling Tower, Three (3) Boilers, Twenty-Seven (27) HVAC Circulation Pumps, Twenty-Two (22) Exhaust Fans, Four (4) Makeup Air Units, Three (3) Air Handling Units, One (1) Heat Recovery Unit, Two Hundred Twenty-Five (225) Fan Coil Units, Fourteen (14) Fan Powered VAV Boxes and Eleven (11) Cooling Only VAV Boxes, Nine Hundred Fifty (950) Plumbing Fixtures, One (1) 1,500 Gallon Grease Interceptor, Two (2) Complete Sump Pump Systems.

St. Regis Resort

Location: Park City, Utah

Project Owner / Client: Deer Crest Janna LLC

General Contractor: Okland Construction Co., Inc.

Architect: IBI Group

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilating, Air Conditioning, and Plumbing

Building Highlights: 446,000 ft.² - 26 Private Residences - 67 Condominium Hotel Suites - 181 Hotel Rooms Eleven-Story Building 14,000 ft.² Spa with Salon 3,000 ft.² Fitness Facilities Luxury Ski Lounge with Ski Valet Service Two-tiered Infinity Pool Restaurant/Wine Bar/Ski Lounge Two-Story Underground Parking Mechanical Systems: Two (2) 12 Million BTU Boilers Two (2) 400-Ton Chillers Three (3) Cooling Towers Three (3) Air Handlers Snowmelt System