Entertainment

Jordan Commons - Megaplex 17

Location: Sandy, UT

Project Owner / Client: Larry H. Miller Group

General Contractor: Sahara, Inc.

Architect: FFKR

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Plumbing, Piping, and Controls

Building Highlights: Building Highlights: - 134,400 ft.² which includes 17 theaters (approx. 5,000 seats), including full food court with 5 full kitchens and restaurants. Construction Schedule: - Start: January 1997 - Completion: October 1999 Mechanical Systems: Two (2) Chillers - 250 Tons Each Two (2) Hot Water Boilers - 4.1 MBTUs Each Twenty (20) Air Handling Units Thirteen (13) Pumps Two Hundred Sixty-Seven (267) Plumbing Fixtures

Megaplex 20 @ The District

Location: South Jordan, UT

Project Owner / Client: Larry H. Miller Group

General Contractor: Sahara, Inc.

Architect: FFKR

Mechanical Engineer: CCI Mechanical, Inc.

Mechanical Contractor: CCI Mechanical, Inc.

CCI Mechanical Role: Engineering, Heating, Ventilation, Air Conditioning, Plumbing, Piping, and Controls

Building Highlights: Building Highlights: - 227,000 ft.² - including 20 theaters (approximately 5,600 seats), also includes a full food court with 5 full kitchens and restaurants. Snowmelt System Outside Water Feature Construction Schedule: - Start: August 2005 - Completion: June 2006 Mechanical Systems: Two (2) Chillers - 210 Tons Each Two (2) Hot Water Boilers - 8 MBTUs Each Twenty-Six (26) Air Handling Units Twelve (12) Pumps Two Hundred Sixty-Eight (268) Plumbing Fixtures